Close out document for space projects

Close out document for space projects (DOC, 122KB)

The purpose of this document is to mark the completion of the identification stage of the project by confirming that essential deliverables, documents and activities have been completed and lessons learned identified.

This table lists the required National Project Management System (NPMS) deliverables at the delivery close out of space projects (leased or crown accommodation), whether they are required or not for NPMS full, lite or ultra Lite, when and by who they were approved, and where the documents are located. (This table is only an example and contains no data. A dot means the document is required.)

National Project Management System (NPMS) deliverable documents required at the delivery close out
Responsibility NPMS deliverable documents Footnote 1 Project execution stream requirements Approved by / Date Electronic project filing structure (EPFS) document location
(Note: delete file reference and indicate file location if different from EPFS location)
Leased accommodation Crown accommodation
Full (F) Footnote 2 Lite (L) Footnote 3> $1M Ultra lite (UL) Footnote 4
> $250K-
<
$1M
F L
> $1M
UL
> $250K -<$1M
Project leader (PL) /
Project manager (PM)
Specific services agreement (SSA)   F_CLIENTS\01_Agreement\SSA
PM Approved project management plan (PMP)           A_NPMS\06_Planning\project management plan approval
PM Approved medium project management plan (MPMP)           A_NPMS\06_Planning\Project Management Plan Approval
PM Approved simplified project management plan (S-PMP)           A_NPMS\06_Planning\project management plan approval
PL Approval document (AD) - documented evidence of project leader acceptance of design development drawings and substantive construction cost estimate OR long form investment analysis report (LF-IAR) when amended project approval (PA) / expenditure authority (EA) submission is required to be sought           A_NPMS\07_Design
PL Approved Document (AD) - LF-IAR and Treasury Board (TB) Submission if required           A_NPMS\07_Design\IAR Signed (EA) A_NPMS\07_Design\TB Submission (EA)
PL Approved document (AD) - documented evidence of project leader acceptance of design development drawings and substantive construction cost estimate OR short form investment analysis report (SF-IAR) when amended PA/EA submission is required to be sought             A_NPMS\07_Design
PL Approval document (AD) - SF-IAR             A_NPMS\07_Design\IAR Signed (EA)
PM Product turn-over (PTO) - signed interim cert. of completion of lessee's improvements         D_LEASE\SALI\02_Deliverables\Interim Certificate of Completion of Lessee's Improvements
PM Product turn-over (PTO) - signed certificate of substantial performance (Interim)         C_CONSTRUCTION\Contract X \16_Cert Subst Perf\Signed Cert Subst Perf (S34)
PM Lessons-learned log   A_NPMS\05_Identification Close Out\Lessons Learned Documents
PM Lessons-learned report (required for projects with PCRA level 3 or higher)       A_NPMS\05_Identification Close Out\Lessons Learned Documents
PM Approved close out document (COD)   A_NPMS\08_Delivery Close Out\close out document approval (CODA)

This table lists the required NPMS supporting documents at the delivery close out of space projects (leased or crown accommodation), whether they are required or not for NPMS full, lite or ultra lite, whether they are completed or not, and where the documents are located. (This table is only an example and contains no data. A dot means the document is required.)

National Project Management System (NPMS) support documents required at the delivery close out
Responsibility NPMS support documents Project execution stream requirements Completed (Yes / No / Not applicable) Electronic project filing structure (EPFS) document location
(Note: delete file reference and indicate file location if different from EPFS location)
Leased accommodation Crown accommodation
Full (F) Footnote 2 Lite (L) Footnote 3
> $1M
Ultra lite (UL) Footnote 4
> $250K-
<
$1M
F L
> $1M
UL
> $250K -<$1M
PL Signed identification close out document (ICOD)   A_NPMS\05_identification close out\Identification close out document (ICOD)
PM Environmental compliance management program (ECMP) checklist         I_SPECIALIZED AREAS\Environmental Requirements\ECMP Checklist
PM Preliminary identification of env. services required (PIESR)         I_SPECIALIZED AREAS\Environmental Requirements
PM Commissioning assessment form         C_CONSTRUCTION\Contract X \14_Deliverables\Commissioning Docs
PM Risk management plan (project risk assessment, risk register, monitoring record) A_NPMS\09_NPMS Supporting Documents\Risk Management Plan
PM Project master schedule   H_PROJECT MONITORING\01_Project Time Scope Budget\ Schedule
PM Project review advisory committee (PRAC) minutes       A_NPMS\09_NPMS Supporting Documents \PRAC
PL Revised project complexity and risk assessment (PCRA) (if required to be revised)     A_NPMS\09_NPMS Supporting Documents \PCRA
PM Substantive cost estimate (for EA, for implementation phase, and to obtain amended PA if required)       H_PROJECT MONITORING\01_Project Time Scope Budget\Budget
PM Substantive cost estimate (require only for amended PA and EA)         H_PROJECT MONITORING\01_Project Time Scope Budget\Budget
PM Sub agreement for lessee improvements (SALI) (for design services and for construction services)         D_LEASE\SALI\03_SALI X (replace with SALI no)\SALI Contract Documents
PM Lease contract award letter (copy)         D_LEASE\Lease
PM Lease documentation package (copy)         D_LEASE\Lease
PM Construction change order log         C_CONSTRUCTION\Contract X \06_Change Orders\Change Order Log
PM As-built documentation and O&M manuals   C_CONSTRUCTION\Contract X\14_Deliverables\As-built Drawings
C_CONSTRUCTION\Contract X\14_Deliverables\O and M Manuals
PM Occupancy permit         D_LEASE\SALI\02_Deliverables\Occupancy Permit
PL Occupancy instrument   A_NPMS\08_Delivery Close Out
PM Completed SIGMA performance indicators
(for schedule, cost, scope)
      Not Applicable
PM Consultant performance evaluation report Form (CPERF)       B_SERVICES\Service Contract X \07_Contract Close out\CPERF
PM Contractor performance evaluation report Form (CPERF)       C_CONSTRUCTION\Contract X \19_Contract Close out\CPERF
PM Commissioning report (if required)   C_CONSTRUCTION\Contract X\14_Deliverables\Commissioning Docs
PL Non compliance with Government of Canada (GC) workplace fit up standards - Monitoring form and Assistant Deputy Minister (ADM) decision (if applicable)   H_PROJECT MONITORING\05_Compliance and Audits\Fit-up Compliance Monitoring Form
PM Signed final certificate of completion of lessee's improvements
(Note: Completion of this document and the required NPMS project execution stream deliverable and support documents identified above, constitute NPMS project delivery close out.)
        D_LEASE\SALI\02_Deliverables\Final Certificate of Completion of Lessee's Improvements
PM Signed certificate of completion (Final)
(Note: Completion of this document and the required NPMS project execution stream deliverable and support documents identified above, constitute NPMS project delivery close out.)
        C_CONSTRUCTION\Contract X\17_Cert Completion\Signed Cert Compl (S34)

Prepared by:
Signature

Please print:
Name, title (role of project manager) and date

Agreed by:
Signature

Please print:
Name, title (role of project leader) and date

Approved by:
Signature

Please print:
Name, title (For NPMS full: role of project director / Regional manager project management; For NPMS lite and ultra lite: Senior project manager) and date

Cc: Property manager

This table lists the post project delivery close out activities of space projects (leased or crown accommodation), whether they are completed or not, and where the documents are located. (This table is only an example and contains no data. A dot means the document is required.)

Post project delivery close out activities
Responsibility Post project delivery close out activities Project execution stream requirements Completed (Yes / No / Not applicable) Electronic project filing structure (EPFS) document location
(Note: delete file reference and indicate file location if different from EPFS location)
Leased accommodation Crown accommodation
Full (F) Lite (L)
> $1M
Ultra lite (UL)
> $250K-
<
$1M
F L
> $1M
Ultra lite (UL)
> $250K -<$1M
PM Final space measurement   A_NPMS\08_Delivery Close Out
PM Completed warranty files  (if applicable)         C_CONSTRUCTION\Contract X\14_Deliverables\Warranties
PM Completed contract files   B_SERVICES\Service Contract X\01_Consultant Contract\Contract Docs\Signed Contract (S32)
C_CONSTRUCTION\Contract X \01_Contract\Contract Docs\Signed Contract
E_GOODS\Goods Contract X \01_Supplier Agreement\Contract Docs\Signed Contract (S32)
PM Project closed out in SIGMA   Not Applicable

Prepared by:
Signature

Please print:
Name, title (role of project leader) and date