Figure 1: System Hierarchy

This image describe the interaction of the system hierarchies. The design process proceeds from top to bottom of this hierarchy:

  • Facility
  • Environment
  • Integrated sytems
  • Systems
  • Subsystems
  • Equipment
  • Components

The commissioning process proceeds from bottom to top of the above hierarchy.