Update #18: West Block—Committee Room 3

Transcript - Update #18: West Block—Committee Room 3

Start of video.

(Light instrumental music is played in the background throughout the video.)

(Title screen shows title in the middle of screen, a yellow box runs around the text. At the bottom of the screen, a line drawing of the Parliament skyline runs from left to right.)

Text on screen: Committee Room 3 West Block Daily Update 18.

(Pans left to right showing committee room. The walls are clad in wood. Diamond shaped lights are illuminated in the ceiling. Two small air cleaners and a table are seen on the floor.)

(Close up detail of the wooden wall paneling. Vertical perforations are seen in the wood.)

(Detail of two workers adjusting one of the wooden wall panels. The worker on the left is hitting the panel with a rubber hammer. The worker on the right is verifying the spacing of the panel.)

(Close up detail of the translation booth. The glass window separating the translation booth from the committee room is partially installed. A piece of green tape is diagonally adhered to the centre piece of glass. A worker is partially seen crouched down at the bottom of the frame.)

(Music changes from light instrumental to upbeat)

(Wide angle time lapse images of workers installing the baseboard for the translation booth. A small air cleaner is seen in the foreground.)

(Public Services and Procurement Canada Wordmark.)

(Music stops.)

(Canada Wordmark.)

End of video.

Date modified: