Update #30: Visitor Welcome Centre—Terrazzo Floor

Transcript - Update #30: Visitor Welcome Centre—Terrazzo floor

Start of video.

(Light instrumental music is played in the background throughout the video.)

(Title screen shows title in the middle of screen, a yellow box runs around the text. At the bottom of the screen, a line drawing of the Parliament skyline runs from left to right.)

Text on screen: Terrazzo Floor Visitor Welcome Centre Daily Update 30

(Handheld shot of a construction worker spreading a powder base material onto the floor using a shovel.)

(Handheld shot of a construction worker on the ground spreading the powder base material with a long board and with a hand tool.)

(Handheld shot of two construction workers using hand tools to level the powder base material.) The right side of the frame shows base material that is already level.)

(Handheld shot of a construction worker digging a channel for a metal divider strip. Other previously installed metal divider strips are seen around the worker.)

(Handheld shot of a worker using a grinding polishing machine to prepare the terrazzo surface. The floor is covered in a white slurry. The stone clad walls are covered in plastic. The shot gradually zooms in on the worker as he moves the machine back and forth.)

(Handheld shot of a worker using a vacuum to remove the slurry from the floor. The worker is very dirty from being splashed with the slurry.)

(Close up handheld shot of a vacuum suctioning the white slurry off of the floor.)

(Pans from left to right showing a section of completed floor partially covered by white slurry.)

(Pans from left to right showing a large section of completed terrazzo floor.)

(Public Services and Procurement Canada Wordmark.)

(Music stops.)

(Canada Wordmark.)

End of video.

Date modified: